EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wstoelting
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (396)
Research
- (3)
Workshop
- (3)
Empennage
Fuselage
- (74)
Firewall
- (1)
Tail Feathers
- (5)
Wings
- (135)
Controls
- (7)
Avionics
- (8)
Lighting
- (2)
Instrument Panel
- (13)
Landing Gear
- (19)
Engine
- (41)
Propeller
- (5)
Fuel System
- (30)
-
Fuel Return Line
-
Firesleeve and Fitting
-
Fuel Lines to Firewall
-
Fuel Bulkhead Fittings
-
Fuel Line Reroute
-
Support for Fuel...
-
Fuel Shutoff
-
Vent Line, Filter,...
-
Metal Fuel Routing,...
-
Fuel Line Mounting...
-
Installed Fuel Line...
-
Fuel Line, Thread...
-
Fuel Fittings and...
-
Painted Header Tank
-
Fuel Fittings/Filter
-
Fuel Line, Return
-
Fuel Pump
-
Fuel Line
-
Header Tank
-
Aluminum Fuel Line...
-
Shutoff Valves
-
Aluminum Header Tank
-
Nav/Position/Strobe...
-
Fuel Pumps
-
Left Wing Fuel Tank...
-
Tapped Sight Gauge...
-
Header Tank Fabricate
-
Header Tank...
-
Header Tank Pattern
-
Header Tank
Interior Finish
- (8)
Paint / Decals
- (22)
Inspection
- (2)
Tools
- (18)
Builder Name:
Wade Stoelting
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
799.9
Total Flight Time:
Total Expense:
$70783.69
Start/Last Date:
Oct 09, 2019 - No Finish Date
Engine:
Yamaha Apex
Friendly URL:
https://eaabuilderslog.org?s=wstoelting
Home or Last Project Picture
Jan 15, 2023
Fuel Lines to Firewall
- (2 hours)
Category: Fuel System
Built two fuel lines for cabin side connecting tubing lines to firewall bulkhead fitting. Located bulkhead fitting locations. Drilled holes in firewall. Fabricated hoses using Summiy braided hose and Summit Racing fittings.
20230115_163328.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.